|
|
The Main hull The main hull building frame was set up. Sorry I didn't take any photos of this stage but it is similar to the Scarab 32 setup.
The panels were attached to the building frame. The chines were joined using light weight bog. Then they were sanded and faired and taped with fibreglass tape.
|